R E L A T E D   C O N T E N T
ADVERTISEMENT

Supercomputers aid F1 car design

WilliamsF1 uses Linux clusters for developement

Miya Knights in Valenica, Computing 02 Feb 2005
ADVERTISEMENT

Formula One (F1) racing team BMW WilliamsF1 has used Linux-based supercomputers to treble its computational capacity for designing its new car, which was launched this week.

The FW27, the team's car for the 2005 Grand Prix championship, owes much to pre-testing modelling and simulations run on a powerful combination of computer systems, speeding development and allowing the team to conform to new regulations governing the sport.

The car's design required simulations of 1.3TB of aerodynamic data - the equivalent of more than 70,000 volumes of the Encyclopaedia Britannica.

This analysis capability was vital, says Alex Burns, general manager of Williams Grand Prix Engineering.

'The computational fluid dynamic (CFD) simulations we ran helped us get the traditional testing in the wind tunnel right, replacing trial and error,' he said.

The team had to increase capacity to analyse twice as many CFD and crash-test models than last year. The results affected the FW27's front and rear wings, as well as the brake and radiator ducts, without relying as heavily on wind tunnel testing.

Technology supplier and sponsor HP provided WilliamsF1 with a clustered Linux supercomputing infrastructure for running simulations. This connected to a utility computing system at HP Labs in Bristol, to provide flexible access to extra capacity as and when needed.

Tim Bush, manager of the engineering division of HP's High Performance Technical Computing division in Europe, which had close links to the development of Williams' technical environment, says last-minute aerodynamic regulations issued by the championship's governing body are a good example of when unplanned extra processing capacity is needed.

'What's really changing is the level of technical ability and speed of agility,' he said.

Frank Williams, WilliamsF1 team principal, told Computing: 'The CFD data was very predictive and very accurate. The practical part of testing, in the wind tunnel, was running behind the predictions of the CFD group. It's always a technical race to some extent in F1.'

See also:

Linux helps Renault slash computational analysis time by 90 per centIBM e1350 Linux cluster cuts simulation time from three weeks to 18 hours  15 Mar 2005
Car firm says millions of visitors view site during rally championship  17 Feb 2005
£2.25m supercomputer will help improve aerodynamic performance of Sauber Petronas cars in 2005  05 Jan 2005

All Chips & Components

Like this story? Spread the news by clicking below:

Post this to Delicious del.icio.us    Post this to Digg Digg this    Post this to reddit reddit!

Permalink for this story

M A R K E T P L A C E
Sponsored links
F E A T U R E D   J O B S
| Computer People
Our noteworthy client in the South West requires a C#.NET Developer to help develop and rewrite their Finance Systems interfaces. The ideal candidate will be available immediately and be a strong developer using C#.NET. You ... more >
| JAM Recruitment
Job Reference: 21307 Job Title: Project Manager (HR amp; Payroll technology transformation? Do you have Project Management experience gained within client facing projects? Are you a forward thinking professional, comfortable with people management? The Background ... more >
| JAM Recruitment
Position: HRIS Specialist Reference: 21191 Salary: c£40-50k + Excellent Benefits Location: West Midlands Contact: Chris Pearson - JAM HR Systems Are you a techno-functional professional with a background in developing and driving HR Information Systems? ... more >
| JAM Recruitment
Position: EMEA HR Systems Manager Reference: 21014 Salary: c£55-65,000 + Bonus + Benefits Location: North London Contact: Chris Pearson - JAM HR Systems Are you a proven HR technology leader with aptitude to drive international ... more >
More job opportunities